Framers finished up Thurday March 12 after putting in stairs to the attic, putting in windows and doors, making a few changes and finishing up.

IMG 3344The front door. It will be painted red. We only had room for one side lite, but it does have a nice transom over it.IMG 3345The rest of the exterior doors. There are a total of 9: the entries into the house and garage plus one for the attic, one for the stair from garage to basement, one for the cold storage under the porch.IMG 3455Front door installed but not painted.IMG 3360Stairs to the attic are built now.IMG 3360Attic area will be left unfinished, but we will run power and a heat vent if we want to finish in the fulture.IMG 3362There is a full 8 feet of head room, but insulation will be between the floor trusses and the attic floor.IMG 3361Window facing the lake in attic. I should have put a window at the other end too, but missed that on the plan. I'm not going to add it now. Something for the future.IMG 3363They have to build the walls around the stairwell yet which will get insulated.IMG 3599Sneak preview! This is what it looks like when the stairwell enclosure is done. The door will be an insulated exterior door, because attic will not be heated.IMG 3386Master bath - looking through the vanity to the water closet. Missing at wall? No, waiting for the pocket door frame.IMG 3385And there is the pocket door frame, ready to make the "wall" for the water closet.IMG 3395Looking from the new "bunk room" through the utility room to the back stair leading to the garage.IMG 3401Where the 2 person sauna is designed to go. The stove will be where the boxes are. Benches on right.IMG 3399In the back is where the one and only bath tub will go. The short wall is for a shelf at the back end of the tub.IMG 3692Sneak Preview!! Here is the tub in place. The "shelf" looks a bit high, I will probably have them lower it.IMG 3319The overhang (sometimes called eyebrow) above the main windows got built. I had it added to shade the windows in the summer. IMG 3318Balcony framing finished. The deck will be manmade material TREX or a recycled product called REVOLVE made by Renew Plastics in Luxemburg, WIIMG 3445The shingles got put on over the weekend, March 14-15.